|  | 
            
              |  | 
                    
                      | 2021/7/29 Typhoon "fireworks" is coming, while Mr. Wang's factory was almost in danger! How to avoid the hidden dangers of clamping parts?
 |  |  
            
              |  | 
                    
                      | 2021/7/20 Mr. Yu from Anhui called and consulted us: Recently, there was a construction site project that needed PVC joints and pipe fittings. The overall value of the goods was about 5 million yuan. 30% of the deposit was paid at the beginning, and the payment later could be paid off in 12 months. Is this order worthy to do?
 |  |  
            
              |  | 
                    
                      | 2021/7/20 Today, we mainly start to talk about how to choose the right materials when starting a basin factory.
 |  |  
            
              |  | 
                    
                      | 2021/7/16 If you want to open a plastic basin factory, what should do you do as the preparation?
 |  |  
 
 |